Electrical Service

Charging Station Installation.

Tesla, Hyundai, Kia, Ford — whatever your electric vehicle, GARO Électrique installs your Level 2 charging station in the Eastern Townships. Panel assessment, code-compliant installation, and advice to maximize available grants.

Eastman, Magog, Orford, Bromont, and surrounding areas (50km)
RBQ and CMEQ Licensed
3+ Years of Experience
650+ Projects Completed
Mon–Fri 7am–4pm

Our Method

How We Work

A clear and transparent process for hassle-free service.

1

Free Assessment

Visit to evaluate your panel, distance to cover, and determine the best technical solution.

2

Advice and Quote

Personalized recommendation (charger vs outlet), fixed quote, information on available grants.

3

Clean Installation

Dedicated circuit installation, code-compliant setup, complete testing. Cleanliness guaranteed.

4

Commissioning

Test with your vehicle, usage instructions, documentation for grants. Ready to drive!

Included

A Complete
Service.

All our services include the essentials for a compliant and durable installation. No hidden fees.

240V Dedicated Circuit

Code-compliant installation of a dedicated circuit with appropriate breaker (40A or 50A depending on charger).

Adequate Protection

Appropriate breaker type, visible disconnect if required, full compliance with Electrical Code.

Quality Materials

Robust copper wiring, protective conduits, recognized brand chargers if supplied by us.

Grant Advice

Up-to-date information on available assistance, necessary documents for your application.

EV Specialist

Continuous training on charging systems. All vehicle models, all charger brands.

Safe Installation

Strict code compliance. No shortcuts that endanger your home or your car.

Competitive Prices

Transparent quotes, no hidden fees. Fair rates for professional installation.

Quick Response

Short lead time between quote and installation. You want to drive electric quickly, we understand.

FAQ

Frequently Asked Questions

Answers to your questions about this service

Cliquez pour déplier
We install all types: dedicated wall-mounted chargers (ChargePoint, FLO, Tesla Wall Connector) or NEMA 14-50 outlets. The choice depends on your vehicle, budget, and electrical panel. A dedicated wall charger offers the best experience (stored cable, optimized charging), but a 14-50 outlet suffices for many users. We advise you based on your situation.
That's the first thing we check. A Level 2 charger requires a dedicated 40A or 50A circuit. If your panel is full or undersized, we propose solutions: optimization of existing space, panel upgrade, or a load manager that limits power based on overall house consumption. We always find a suitable solution.
Yes! Hydro-Québec offers a grant for residential installation (amount varies depending on current programs). We guide you through the process and provide the necessary documents. For businesses and buildings, other programs exist. We stay up-to-date on available assistance to save you money.
A standard installation (panel in garage, short distance) takes 3 to 4 hours. If the panel is far away (basement far from garage) or if upgrade work is needed, it can take a day. We assess all this during the quote visit to give you a precise timeline.
Absolutely. We install infrastructure for rental buildings, condos, or families with multiple electric vehicles. This includes electrical planning to support multiple simultaneous charges, installation of shared or individual chargers, and implementation of billing systems if necessary for buildings.
Yes, 1 year on labor and materials. We use quality components and rigorously test every installation. In case of a problem (rare), we return quickly. Our clients are satisfied: check our reviews, several specifically mention the quality of our charger installations.

Service Area

Eastman &
50km Surrounding Area

Based in Eastman, we serve the Eastern Townships and surrounding areas. Magog, Bromont, Waterloo, Cowansville and all nearby villages.

15 Rue Lambert

Eastman, QC J0E 1P0

Monday to Friday

7:00 AM to 4:00 PM

Cities Served

Eastman
Magog
Bromont
Waterloo
Cowansville
Lac-Brome
Frelighsburg
Dunham
Saint-Étienne-de-Bolton
Austin
Barnston-Ouest
Bonsecours
Eastman
50km
Map showing the 50 kilometer service area around Eastman, Quebec, covering the regions of Magog, Bromont, Waterloo, Cowansville and the Eastern Townships.

Contact

Go electric hassle-free

Charging station installation requires expertise. Trust GARO Électrique for a safe, code-compliant, future-ready installation. Free quote in the Eastern Townships.

Address

15 Rue Lambert, Eastman, QC J0E 1P0

Licenses

RBQ and CMEQ

* Emergency service not available. Hours: Mon-Fri 7am-4pm

Request your free quote

Fill out the form and we will contact you within 24h.

Réponse dans les plus brefs délais • Licences RBQ et CMEQ